Work progressing well with greenkeepers shed

Our investment continues at pace. The greenkeeper shed extension is progressing well. The footings have been dug out and concreted ready for the steel work to be erected.

The footing has also been dug out ready for the extended brickwork for the flowerbed along side the new shed.

The top soil has been removed from the site and hard core has been spread, in readiness for the concrete pad.

The steel work should be coming to site next week and the week after it should be being erected.

At the start of December the roof and concrete panels should be installed. In the middle of December the side of the building should be clad and doors fitted.

By the time we get to about the 18th December, the builders will be installing the concrete floor and building brick wall for the flower bed.

Hopefully by Christmas we should have a weather proof shed.