/
    • Work on levelling 7th medal tee

    • As reported in our Members Spring Newsletter, over the last week work has been completed on this tee.

      The tee had subsided and so has been re-levelled and now has a gentle fall from front to back. The old turf was stripped off, soil moved around and more brought in and new turf relaid on top. The right hand side of the tee now runs straight into the rough.

      The sprinklers have also been moved and are placed at each side to give better coverage over the tee.

      Andrew is hoping that this tee will back in play in June.